Jeffersonville 69kV (AC2-171)

Jeffersonville 69kV is a 29.0 MW solar interconnection project in Ross, Ohio with a current status of withdrawn.

29.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameJeffersonville 69kV
Queue IDAC2-171
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity29.0 MW
StateOhio
CountyRoss
Point of interconnection—
Requested (queue) date2017-03-30
Proposed in-service date2019-05-31
Operational date—
Withdrawn date2017-08-23
Developer—
Utility / transmission ownerDayton

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.