Jenna Eco-Electric Solar (25INR0632)

Jenna Eco-Electric Solar is a 576.3 MW solar interconnection project in Fisher, Texas with a current status of operational. It is proposed to connect at Tap 345 kV 1048 Tonkawa Switch - 1430 Graham SES .

576.3 MWCapacity
OperationalStatus
FisherMarket
SolarTechnology

Project facts

Canonical nameJenna Eco-Electric Solar
Queue ID25INR0632
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketFisher
TechnologySolar
Capacity576.3 MW
StateTexas
CountyFisher
Point of interconnectionTap 345 kV 1048 Tonkawa Switch - 1430 Graham SES
Requested (queue) date2024-05-20
Proposed in-service date
Operational date2028-09-21
Withdrawn date
DeveloperClean Solar
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.