Jennings-Hoyes 34.5kV (AB1-065)

Jennings-Hoyes 34.5kV is a 10.9 MW solar interconnection project in Garrett, Maryland with a current status of withdrawn.

10.9 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameJennings-Hoyes 34.5kV
Queue IDAB1-065
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity10.9 MW
StateMaryland
CountyGarrett
Point of interconnection
Requested (queue) date2015-08-31
Proposed in-service date2019-10-31
Operational date
Withdrawn date2020-11-20
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata