John W Turk Jr Power Plant 345 kV Substation (GEN-2024-227)

John W Turk Jr Power Plant 345 kV Substation is a 200.0 MW battery interconnection project in Hempstead, Arkansas with a current status of withdrawn. It is proposed to connect at John W Turk Jr Power Plant 345 kV Substation.

200.0 MWCapacity
WithdrawnStatus
ARMarket
BatteryTechnology

Project facts

Canonical nameJohn W Turk Jr Power Plant 345 kV Substation
Queue IDGEN-2024-227
Statuswithdrawn
Source statusWITHDRAWN
MarketAR
TechnologyBattery
Capacity200.0 MW
StateArkansas
CountyHempstead
Point of interconnectionJohn W Turk Jr Power Plant 345 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date2030-09-15
Operational date
Withdrawn date2026-05-21
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata