Jones St. No 1201 69kV substation (GEN-2017-198)

Jones St. No 1201 69kV substation is a 11.6 MW battery interconnection project in Omaha, Nebraska with a current status of withdrawn. It is proposed to connect at Jones St. No 1201 69kV substation.

11.6 MWCapacity
WithdrawnStatus
NEMarket
BatteryTechnology

Project facts

Canonical nameJones St. No 1201 69kV substation
Queue IDGEN-2017-198
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyBattery
Capacity11.6 MW
StateNebraska
CountyOmaha
Point of interconnectionJones St. No 1201 69kV substation
Requested (queue) date2017-11-30
Proposed in-service date2027-02-28
Operational date
Withdrawn date
Developer
Utility / transmission ownerOPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-27statusactivewithdrawnhigh
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.