Joplin 389 and Silver Creek 469 161 kV Line (GEN-2023-233)

Joplin 389 and Silver Creek 469 161 kV Line is a 74.9 MW battery interconnection project in Jasper, Missouri with a current status of withdrawn. It is proposed to connect at Joplin 389 and Silver Creek 469 161 kV Line.

74.9 MWCapacity
WithdrawnStatus
MOMarket
BatteryTechnology

Project facts

Canonical nameJoplin 389 and Silver Creek 469 161 kV Line
Queue IDGEN-2023-233
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologyBattery
Capacity74.9 MW
StateMissouri
CountyJasper
Point of interconnectionJoplin 389 and Silver Creek 469 161 kV Line
Requested (queue) date2023-10-02
Proposed in-service date2025-11-15
Operational date
Withdrawn date2023-11-20
Developer
Utility / transmission ownerEDE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata