Joppa 161kV Switchyard (R1029)

Joppa 161kV Switchyard is a 37.0 MW generation interconnection project with a current status of operational. It is proposed to connect at Joppa 161kV Switchyard.

37.0 MWCapacity
OperationalStatus
Market
GenerationTechnology

Project facts

Canonical nameJoppa 161kV Switchyard
Queue IDR1029
Statusoperational
Source statusDone
Market
TechnologyGeneration
Capacity37.0 MW
State
County
Point of interconnectionJoppa 161kV Switchyard
Requested (queue) date2022-12-12
Proposed in-service date2024-12-01
Operational date2024-12-01
Withdrawn date
Developer
Utility / transmission ownerMISO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata