Joppa-Joppa North Bus 161kV Substation (J1418)

Joppa-Joppa North Bus 161kV Substation is a 100.0 MW solar interconnection project in Pulaski County, Illinois with a current status of withdrawn. It is proposed to connect at Joppa-Joppa North Bus 161kV Substation.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameJoppa-Joppa North Bus 161kV Substation
Queue IDJ1418
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateIllinois
CountyPulaski County
Point of interconnectionJoppa-Joppa North Bus 161kV Substation
Requested (queue) date2019-04-29
Proposed in-service date2021-12-01
Operational date2021-12-01
Withdrawn date2020-01-02
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata