Jordan Cove (L0473)

Jordan Cove is a 26.0 MW other interconnection project in Coos, Oregon with a current status of withdrawn. It is proposed to connect at CLPUD Glascow to Jordan Point 115 kV Line.

26.0 MWCapacity
WithdrawnStatus
ORMarket
OtherTechnology

Project facts

Canonical nameJordan Cove
Queue IDL0473
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyOther
Capacity26.0 MW
StateOregon
CountyCoos
Point of interconnectionCLPUD Glascow to Jordan Point 115 kV Line
Requested (queue) date2019-12-17
Proposed in-service date2023-10-01
Operational date
Withdrawn date
DeveloperPacifiCorp
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.