Jourdanton BESS (27INR0433)
Jourdanton BESS is a 9.8 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at Station Name: Jourdanton_x000D_ Station Code: JOURDNTN_x000D_ Load/Load Transformer Name: TR1X _x000D_ PTI BUS number: 8607 _x000D_ Voltage in kV: 69 kV.
Project facts
| Canonical name | Jourdanton BESS |
|---|---|
| Queue ID | 27INR0433 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 9.8 MW |
| State | — |
| County | — |
| Point of interconnection | Station Name: Jourdanton_x000D_ Station Code: JOURDNTN_x000D_ Load/Load Transformer Name: TR1X _x000D_ PTI BUS number: 8607 _x000D_ Voltage in kV: 69 kV |
| Requested (queue) date | 2024-11-07 |
| Proposed in-service date | 2025-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Jourdanton BESS LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata