Juliet Energy (AF2-126)

Juliet Energy is a 12.0 MW solar interconnection project in Wood, Ohio with a current status of active. It is proposed to connect at Weston 69 kV II.

12.0 MWCapacity
ActiveStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameJuliet Energy
Queue IDAF2-126
Statusactive
Source statusactive
MarketPJM
TechnologySolar
Capacity12.0 MW
StateOhio
CountyWood
Point of interconnectionWeston 69 kV II
Requested (queue) date2020-02-28
Proposed in-service date2027-06-01
Operational date
Withdrawn date
DeveloperJuliet Energy Project, LLC
Utility / transmission ownerATSI

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata