Jumping Cactus Storage (26INR0391)

Jumping Cactus Storage is a 125.3 MW other interconnection project in Duval, Texas with a current status of operational. It is proposed to connect at 138 kV Zenaida Bus# 80043 .

125.3 MWCapacity
OperationalStatus
DuvalMarket
OtherTechnology

Project facts

Canonical nameJumping Cactus Storage
Queue ID26INR0391
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketDuval
TechnologyOther
Capacity125.3 MW
StateTexas
CountyDuval
Point of interconnection138 kV Zenaida Bus# 80043
Requested (queue) date2024-01-11
Proposed in-service date
Operational date2029-09-30
Withdrawn date
DeveloperDove Run Solar Project, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.