JUNIPERUS BESS (27INR0097)

JUNIPERUS BESS is a 169.6 MW other interconnection project in Hopkins, Texas with a current status of operational. It is proposed to connect at TAP CASHSW_T5 (2464) -SULSP_SS1_5 (1697).

169.6 MWCapacity
OperationalStatus
HopkinsMarket
OtherTechnology

Project facts

Canonical nameJUNIPERUS BESS
Queue ID27INR0097
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHopkins
TechnologyOther
Capacity169.6 MW
StateTexas
CountyHopkins
Point of interconnectionTAP CASHSW_T5 (2464) -SULSP_SS1_5 (1697)
Requested (queue) date2023-10-30
Proposed in-service date
Operational date2029-07-09
Withdrawn date
DeveloperBLUE STONE RENEWABLE XXI LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata