Juno Power Express 2 (0792)

Juno Power Express 2 is a 800.0 MW other interconnection project in Suffolk, New York with a current status of withdrawn. It is proposed to connect at Ruland Road 138kV.

800.0 MWCapacity
WithdrawnStatus
KMarket
OtherTechnology

Project facts

Canonical nameJuno Power Express 2
Queue ID0792
Statuswithdrawn
Source status0
MarketK
TechnologyOther
Capacity800.0 MW
StateNew York
CountySuffolk
Point of interconnectionRuland Road 138kV
Requested (queue) date2019-01-29
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperAnbaric Development Partners, LLC
Utility / transmission ownerLIPA

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata