KCE NY 1 (0701)

KCE NY 1 is a 20.0 MW battery interconnection project in Saratoga, New York with a current status of operational. It is proposed to connect at Luther Forest 34.5kV.

20.0 MWCapacity
OperationalStatus
FMarket
BatteryTechnology

Project facts

Canonical nameKCE NY 1
Queue ID0701
Statusoperational
Source status14
MarketF
TechnologyBattery
Capacity20.0 MW
StateNew York
CountySaratoga
Point of interconnectionLuther Forest 34.5kV
Requested (queue) date2018-03-15
Proposed in-service date
Operational date
Withdrawn date
DeveloperKCE NY 1, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.