KCE NY 1 (0701)
KCE NY 1 is a 20.0 MW battery interconnection project in Saratoga, New York with a current status of operational. It is proposed to connect at Luther Forest 34.5kV.
20.0 MWCapacity
OperationalStatus
FMarket
BatteryTechnology
Project facts
| Canonical name | KCE NY 1 |
|---|---|
| Queue ID | 0701 |
| Status | operational |
| Source status | 14 |
| Market | F |
| Technology | Battery |
| Capacity | 20.0 MW |
| State | New York |
| County | Saratoga |
| Point of interconnection | Luther Forest 34.5kV |
| Requested (queue) date | 2018-03-15 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | KCE NY 1, LLC |
| Utility / transmission owner | NYSEG |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata