KCE NY 10 (0804)

KCE NY 10 is a 20.0 MW battery interconnection project in Erie, New York with a current status of active. It is proposed to connect at Erie Substation 34.5kV.

20.0 MWCapacity
ActiveStatus
AMarket
BatteryTechnology

Project facts

Canonical nameKCE NY 10
Queue ID0804
Statusactive
Source status11
MarketA
TechnologyBattery
Capacity20.0 MW
StateNew York
CountyErie
Point of interconnectionErie Substation 34.5kV
Requested (queue) date2019-03-22
Proposed in-service date
Operational date
Withdrawn date
DeveloperKCE NY 1, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.