KCE NY 21 (C26-0004)
KCE NY 21 is a 60.0 MW battery interconnection project in Suffolk, New York with a current status of active. It is proposed to connect at Pulaski 69kV Substation.
60.0 MWCapacity
ActiveStatus
KMarket
BatteryTechnology
Project facts
| Canonical name | KCE NY 21 |
|---|---|
| Queue ID | C26-0004 |
| Status | active |
| Source status | 1 |
| Market | K |
| Technology | Battery |
| Capacity | 60.0 MW |
| State | New York |
| County | Suffolk |
| Point of interconnection | Pulaski 69kV Substation |
| Requested (queue) date | 2026-07-31 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | KCE NY 21, LLC |
| Utility / transmission owner | LIPA |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-09-12 | new_project | — | active | high |
Explore related data
Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.