KCE NY 25, LLC (1300)

KCE NY 25, LLC is a 6.0 MW battery interconnection project in Ontario, New York with a current status of withdrawn. It is proposed to connect at Substation 146.

6.0 MWCapacity
WithdrawnStatus
BMarket
BatteryTechnology

Project facts

Canonical nameKCE NY 25, LLC
Queue ID1300
Statuswithdrawn
Source status0
MarketB
TechnologyBattery
Capacity6.0 MW
StateNew York
CountyOntario
Point of interconnectionSubstation 146
Requested (queue) date2021-11-02
Proposed in-service date2021-12-31
Operational date
Withdrawn date
DeveloperKCE NY 1, LLC
Utility / transmission ownerRG&E

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata