KCE NY 32 (C24-007)

KCE NY 32 is a 250.0 MW battery interconnection project in Columbia, New York with a current status of withdrawn. It is proposed to connect at Churchtown 115kV Substation.

250.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameKCE NY 32
Queue IDC24-007
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity250.0 MW
StateNew York
CountyColumbia
Point of interconnectionChurchtown 115kV Substation
Requested (queue) date2024-08-01
Proposed in-service date
Operational date
Withdrawn date
DeveloperKCE NY 38, LLC
Utility / transmission ownerTransco

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata