Kearsarge Solar with battery (778)

Kearsarge Solar with battery is a 5.4 MW solar+battery interconnection project in Norfolk, Massachusetts with a current status of operational. It is proposed to connect at GRID circuit 335W1, Pole 11 on Williams Way, Bellingham.

5.4 MWCapacity
OperationalStatus
SEMAMarket
Solar+BatteryTechnology

Project facts

Canonical nameKearsarge Solar with battery
Queue ID778
Statusoperational
Source statusC
MarketSEMA
TechnologySolar+Battery
Capacity5.4 MW
StateMassachusetts
CountyNorfolk
Point of interconnectionGRID circuit 335W1, Pole 11 on Williams Way, Bellingham
Requested (queue) date2018-08-31
Proposed in-service date
Operational date2021-12-21
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata