Kelso Gap 138 kV (H23_W70)

Kelso Gap 138 kV is a 100.0 MW wind interconnection project in Garrett, Maryland with a current status of operational.

100.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameKelso Gap 138 kV
Queue IDH23_W70
Statusoperational
Source statusIn Service
Market
TechnologyWind
Capacity100.0 MW
StateMaryland
CountyGarrett
Point of interconnection
Requested (queue) date2002-01-30
Proposed in-service date
Operational date2010-10-26
Withdrawn date
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.