Kendall Revised Reconfiguration Project (570)

Kendall Revised Reconfiguration Project is a 250.0 MW gas interconnection project in Middlesex, Massachusetts with a current status of operational. It is proposed to connect at Where line 875-539 interconnects with TO''s 115KV bus at station.

250.0 MWCapacity
OperationalStatus
BOSTMarket
GasTechnology

Project facts

Canonical nameKendall Revised Reconfiguration Project
Queue ID570
Statusoperational
Source statusC
MarketBOST
TechnologyGas
Capacity250.0 MW
StateMassachusetts
CountyMiddlesex
Point of interconnectionWhere line 875-539 interconnects with TO''s 115KV bus at station
Requested (queue) date2015-10-21
Proposed in-service date
Operational date2016-05-31
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata