KENOWA - LUDINGTON 345.0kV (J3895)

KENOWA - LUDINGTON 345.0kV is a 199.7 MW wind interconnection project in Muskegon, Michigan with a current status of withdrawn. It is proposed to connect at KENOWA - LUDINGTON 345.0kV.

199.7 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameKENOWA - LUDINGTON 345.0kV
Queue IDJ3895
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity199.7 MW
StateMichigan
CountyMuskegon
Point of interconnectionKENOWA - LUDINGTON 345.0kV
Requested (queue) date2025-02-07
Proposed in-service date2028-06-01
Operational date2028-06-01
Withdrawn date2026-04-15
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.