Muskegon County, Michigan — Interconnection Projects
The interXdata warehouse tracks 16 interconnection projects in Muskegon, Michigan, representing 1,784 MW of requested capacity.
16Total projects
0Active
12Operational
4Withdrawn
1,784 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 6 | 970 MW |
| Battery | 3 | 350 MW |
| Wind | 2 | 336 MW |
| Other | 1 | 125 MW |
| Gas | 4 | 3 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Muskegon Solar | 65572_MSP | Solar | 250.0 MW | operational | Muskegon, Michigan |
| White Road - Four Mile 138kV line | J1614 | Solar | 250.0 MW | operational | Muskegon, Michigan |
| Rogers 138 kV Substation | J3486 | Battery | 200.0 MW | withdrawn | Muskegon, Michigan |
| Grassmere 345kV | J1522 | Solar | 200.0 MW | withdrawn | Muskegon, Michigan |
| KENOWA - LUDINGTON 345.0kV | J3895 | Wind | 199.7 MW | withdrawn | Muskegon, Michigan |
| FOUR MILE - WHITE ROAD 138.0kV | J3682 | Solar | 150.0 MW | operational | Muskegon, Michigan |
| MISO Queue Project J609 — Wind in Muskegon, Michigan | J609 | Wind | 136.0 MW | withdrawn | Muskegon, Michigan |
| DU PONT - WHITE LAKE 138.0kV | S1146 | — | 125.0 MW | operational | Muskegon, Michigan |
| DU PONT - WHITE LAKE 138.0kV | S1081 | Battery | 100.0 MW | operational | Muskegon, Michigan |
| Du Pont to Cobb 138 KV (J1375 POI) | J1587 | Solar | 100.0 MW | operational | Muskegon, Michigan |
| DU PONT - WHITE LAKE 138.0kV | S1082 | Battery | 50.0 MW | operational | Muskegon, Michigan |
| Macbeth Solar | 65346_MCB20 | Solar | 20.0 MW | operational | Muskegon, Michigan |
| Lorin Industries | 60102_1 | Gas | 0.8 MW | operational | Muskegon, Michigan |
| Lorin Industries | 60102_4 | Gas | 0.8 MW | operational | Muskegon, Michigan |
| Lorin Industries | 60102_3 | Gas | 0.8 MW | operational | Muskegon, Michigan |
| Lorin Industries | 60102_2 | Gas | 0.8 MW | operational | Muskegon, Michigan |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.