Keshequa Creek Solar (1669)

Keshequa Creek Solar is a 20.0 MW other interconnection project in Livingston, New York with a current status of withdrawn. It is proposed to connect at Line 934 Between South Perry and Meyer 115kV.

20.0 MWCapacity
WithdrawnStatus
CMarket
OtherTechnology

Project facts

Canonical nameKeshequa Creek Solar
Queue ID1669
Statuswithdrawn
Source status0
MarketC
TechnologyOther
Capacity20.0 MW
StateNew York
CountyLivingston
Point of interconnectionLine 934 Between South Perry and Meyer 115kV
Requested (queue) date2024-01-17
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperSR1 Shift Holdco I
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata