KETTLE SOLAR ONE is a 90.0 MW solar+battery interconnection project in San Diego, California with a current status of active. It is proposed to connect at Carrizo Gorge Switchyard 138 kV.

90.0 MWCapacity
ActiveStatus
SDGEMarket
Solar+BatteryTechnology

Project facts

Canonical nameKETTLE SOLAR ONE
Queue ID1532
Statusactive
Source statusACTIVE
MarketSDGE
TechnologySolar+Battery
Capacity90.0 MW
StateCalifornia
CountySan Diego
Point of interconnectionCarrizo Gorge Switchyard 138 kV
Requested (queue) date2018-04-16
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.