Kewanee-Streator 138 kV (AG1-121 - moved to TC1)

Kewanee-Streator 138 kV is a 294.7 MW wind interconnection project in Bureau, Illinois with a current status of withdrawn.

294.7 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameKewanee-Streator 138 kV
Queue IDAG1-121 - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity294.7 MW
StateIllinois
CountyBureau
Point of interconnection
Requested (queue) date2020-08-31
Proposed in-service date2024-12-31
Operational date
Withdrawn date2024-06-24
Developer
Utility / transmission ownerComEd

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata