Kewanee-Streator (AC1-168)

Kewanee-Streator is a 78.7 MW wind interconnection project in Putnam, Illinois with a current status of withdrawn.

78.7 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameKewanee-Streator
Queue IDAC1-168
Statuswithdrawn
Source statusPending Termination
Market—
TechnologyWind
Capacity78.7 MW
StateIllinois
CountyPutnam
Point of interconnection—
Requested (queue) date2016-10-31
Proposed in-service date2025-10-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30statussuspendedwithdrawnhigh
2026-07-29new_project—suspendedhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata