Keystone-Desoto 345 kV (AF1-202)

Keystone-Desoto 345 kV is a 200.0 MW wind interconnection project in Blackford, Indiana with a current status of operational.

200.0 MWCapacity
OperationalStatus
—Market
WindTechnology

Project facts

Canonical nameKeystone-Desoto 345 kV
Queue IDAF1-202
Statusoperational
Source statusPartially in Service - Under Construction
Market—
TechnologyWind
Capacity200.0 MW
StateIndiana
CountyBlackford
Point of interconnection—
Requested (queue) date2019-09-25
Proposed in-service date—
Operational date2026-09-15
Withdrawn date—
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-10operational_date—2026-09-15medium
2026-11-10proposed_online_date2026-09-15—medium
2026-11-10statusactiveoperationalhigh
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata