Keystone-Desoto 345 kV (AF1-223)

Keystone-Desoto 345 kV is a 150.0 MW solar interconnection project in Jay, Indiana with a current status of operational.

150.0 MWCapacity
OperationalStatus
—Market
SolarTechnology

Project facts

Canonical nameKeystone-Desoto 345 kV
Queue IDAF1-223
Statusoperational
Source statusPartially in Service - Under Construction
Market—
TechnologySolar
Capacity150.0 MW
StateIndiana
CountyJay
Point of interconnection—
Requested (queue) date2019-09-27
Proposed in-service date—
Operational date2026-12-31
Withdrawn date—
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-31operational_date—2026-12-31medium
2026-10-31proposed_online_date2026-12-31—medium
2026-10-31statusactiveoperationalhigh
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.