Kickstart Energy Storage VI (29INR0218)
Kickstart Energy Storage VI is a 1,026.2 MW other interconnection project in Ellis, Texas with a current status of operational. It is proposed to connect at 345 KV Venus 1907 to Navarro 68091.
1,026.2 MWCapacity
OperationalStatus
EllisMarket
OtherTechnology
Project facts
| Canonical name | Kickstart Energy Storage VI |
|---|---|
| Queue ID | 29INR0218 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Ellis |
| Technology | Other |
| Capacity | 1,026.2 MW |
| State | Texas |
| County | Ellis |
| Point of interconnection | 345 KV Venus 1907 to Navarro 68091 |
| Requested (queue) date | 2025-12-17 |
| Proposed in-service date | — |
| Operational date | 2029-12-31 |
| Withdrawn date | — |
| Developer | Kickstart Infrastructure LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.