KIFER BESS 1 (1918)

KIFER BESS 1 is a 50.0 MW battery interconnection project in Santa Clara, California with a current status of active. It is proposed to connect at KEN-OKJ 60 kV.

50.0 MWCapacity
ActiveStatus
GBAMarket
BatteryTechnology

Project facts

Canonical nameKIFER BESS 1
Queue ID1918
Statusactive
Source statusACTIVE
MarketGBA
TechnologyBattery
Capacity50.0 MW
StateCalifornia
CountySanta Clara
Point of interconnectionKEN-OKJ 60 kV
Requested (queue) date2021-04-15
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata