Kifer BESS 1 (68953_KB1)

Kifer BESS 1 is a 50.0 MW battery interconnection project in Santa Clara, California with a current status of active.

50.0 MWCapacity
ActiveStatus
CISOMarket
BatteryTechnology

Project facts

Canonical nameKifer BESS 1
Queue ID68953_KB1
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketCISO
TechnologyBattery
Capacity50.0 MW
StateCalifornia
CountySanta Clara
Point of interconnection
Requested (queue) date
Proposed in-service date2026-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerKifer Energy Storage, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata