Kilby1 Part 2 Tier1 BESS (28INR0457)

Kilby1 Part 2 Tier1 BESS is a 330.0 MW other interconnection project in Reeves, Texas with a current status of operational. It is proposed to connect at #60404 Solstice Substation 345 kV.

330.0 MWCapacity
OperationalStatus
ReevesMarket
OtherTechnology

Project facts

Canonical nameKilby1 Part 2 Tier1 BESS
Queue ID28INR0457
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketReeves
TechnologyOther
Capacity330.0 MW
StateTexas
CountyReeves
Point of interconnection#60404 Solstice Substation 345 kV
Requested (queue) date2026-01-26
Proposed in-service date—
Operational date2028-01-21
Withdrawn date—
DeveloperEnergy Efficiency Solar, Inc. dba ACRO Energy Inc.
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-31capacity_mw560.0330high
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-12

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata