Kilby1 Part 6 Large Block Combined Cycle is a 1,056.0 MW gas interconnection project in Reeves, Texas with a current status of operational. It is proposed to connect at #60404 Solstice Substation 345 kV.

1,056.0 MWCapacity
OperationalStatus
ReevesMarket
GasTechnology

Project facts

Canonical nameKilby1 Part 6 Large Block Combined Cycle
Queue ID29INR0199
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketReeves
TechnologyGas
Capacity1,056.0 MW
StateTexas
CountyReeves
Point of interconnection#60404 Solstice Substation 345 kV
Requested (queue) date2026-02-25
Proposed in-service date
Operational date2029-07-19
Withdrawn date
DeveloperEnergy Efficiency Solar, Inc. dba ACRO Energy Inc.
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.