Kimberly Clark-Unit 1 (206)

Kimberly Clark-Unit 1 is a 28.0 MW gas interconnection project in Litchfield, Connecticut with a current status of operational. It is proposed to connect at CL&P Rocky River Substation.

28.0 MWCapacity
OperationalStatus
SWCTMarket
GasTechnology

Project facts

Canonical nameKimberly Clark-Unit 1
Queue ID206
Statusoperational
Source statusC
MarketSWCT
TechnologyGas
Capacity28.0 MW
StateConnecticut
CountyLitchfield
Point of interconnectionCL&P Rocky River Substation
Requested (queue) date2007-04-03
Proposed in-service date
Operational date2008-05-05
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata