Kincaid 345kV (V2-008)

Kincaid 345kV is a 600.0 MW other interconnection project in Christian, Illinois with a current status of withdrawn.

600.0 MWCapacity
WithdrawnStatus
—Market
OtherTechnology

Project facts

Canonical nameKincaid 345kV
Queue IDV2-008
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyOther
Capacity600.0 MW
StateIllinois
CountyChristian
Point of interconnection—
Requested (queue) date2009-05-29
Proposed in-service date2014-10-01
Operational date—
Withdrawn date2013-01-02
Developer—
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata