Kincaid-Pana (AF1-252 - moved to TC1)

Kincaid-Pana is a 62.4 MW battery interconnection project in Christian, Illinois with a current status of withdrawn.

62.4 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameKincaid-Pana
Queue IDAF1-252 - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity62.4 MW
StateIllinois
CountyChristian
Point of interconnection—
Requested (queue) date2019-09-30
Proposed in-service date2022-09-01
Operational date—
Withdrawn date2024-06-24
Developer—
Utility / transmission ownerComEd

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.