Kings Creek - Woodstock 69kV (R51)

Kings Creek - Woodstock 69kV is a 48.0 MW wind interconnection project in Champaign, Ohio with a current status of withdrawn.

48.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameKings Creek - Woodstock 69kV
Queue IDR51
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity48.0 MW
StateOhio
CountyChampaign
Point of interconnection
Requested (queue) date2006-12-06
Proposed in-service date2010-12-15
Operational date
Withdrawn date2007-09-06
Developer
Utility / transmission ownerDayton

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata