Kingsbury County 115kV Substation (GEN-2023-012)

Kingsbury County 115kV Substation is a 98.6 MW wind interconnection project in Lake Preston, South Dakota with a current status of withdrawn. It is proposed to connect at Kingsbury County 115kV Substation.

98.6 MWCapacity
WithdrawnStatus
SDMarket
WindTechnology

Project facts

Canonical nameKingsbury County 115kV Substation
Queue IDGEN-2023-012
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologyWind
Capacity98.6 MW
StateSouth Dakota
CountyLake Preston
Point of interconnectionKingsbury County 115kV Substation
Requested (queue) date2023-10-02
Proposed in-service date2026-10-31
Operational date
Withdrawn date2025-08-25
Developer
Utility / transmission ownerEREC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata