Kirk 138 kV (AF2-122)

Kirk 138 kV is a 107.7 MW solar interconnection project in Licking, Ohio with a current status of operational.

107.7 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameKirk 138 kV
Queue IDAF2-122
Statusoperational
Source statusPartially in Service - Under Construction
Market
TechnologySolar
Capacity107.7 MW
StateOhio
CountyLicking
Point of interconnection
Requested (queue) date2020-02-29
Proposed in-service date
Operational date2026-01-31
Withdrawn date
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata