Klondike 2 Wind (G96)

Klondike 2 Wind is a 50.0 MW wind interconnection project in Wasco, Oregon with a current status of operational. It is proposed to connect at BPA's John Day 230 kV.

50.0 MWCapacity
OperationalStatus
ORMarket
WindTechnology

Project facts

Canonical nameKlondike 2 Wind
Queue IDG96
Statusoperational
Source statusENERGIZED
MarketOR
TechnologyWind
Capacity50.0 MW
StateOregon
CountyWasco
Point of interconnectionBPA's John Day 230 kV
Requested (queue) date2002-03-08
Proposed in-service date
Operational date2003-09-01
Withdrawn date
DeveloperKlondike Wind Power II, LLC
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata