Klondike II Repower (G0618)

Klondike II Repower is a 6.0 MW wind interconnection project in Sherman, Oregon with a current status of operational. It is proposed to connect at BPA's John Day 230 kV.

6.0 MWCapacity
OperationalStatus
ORMarket
WindTechnology

Project facts

Canonical nameKlondike II Repower
Queue IDG0618
Statusoperational
Source statusENERGIZED
MarketOR
TechnologyWind
Capacity6.0 MW
StateOregon
CountySherman
Point of interconnectionBPA's John Day 230 kV
Requested (queue) date2019-03-22
Proposed in-service date
Operational date2020-12-31
Withdrawn date
DeveloperKlondike Wind Power II, LLC
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata