Klondike Wind Power (G54)
Klondike Wind Power is a 24.0 MW wind interconnection project in Sherman, Oregon with a current status of operational. It is proposed to connect at De Moss 69 kV Substation, relocated to 230 kV KSHS.
24.0 MWCapacity
OperationalStatus
ORMarket
WindTechnology
Project facts
| Canonical name | Klondike Wind Power |
|---|---|
| Queue ID | G54 |
| Status | operational |
| Source status | ENERGIZED |
| Market | OR |
| Technology | Wind |
| Capacity | 24.0 MW |
| State | Oregon |
| County | Sherman |
| Point of interconnection | De Moss 69 kV Substation, relocated to 230 kV KSHS |
| Requested (queue) date | 2001-05-09 |
| Proposed in-service date | — |
| Operational date | 2001-10-31 |
| Withdrawn date | — |
| Developer | Klondike Wind Power II, LLC |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata