Klondike Wind Power (55871_Ph 1)

Klondike Wind Power is a 24.5 MW wind interconnection project in Sherman, Oregon with a current status of operational.

24.5 MWCapacity
OperationalStatus
AVRNMarket
WindTechnology

Project facts

Canonical nameKlondike Wind Power
Queue ID55871_Ph 1
Statusoperational
Source status(OP) Operating
MarketAVRN
TechnologyWind
Capacity24.5 MW
StateOregon
CountySherman
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2002-01-01
Withdrawn date
Developer
Utility / transmission ownerAvangrid Power LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata