Klondike Windpower II (56359_PH2)

Klondike Windpower II is a 75.0 MW wind interconnection project in Sherman, Oregon with a current status of operational.

75.0 MWCapacity
OperationalStatus
AVRNMarket
WindTechnology

Project facts

Canonical nameKlondike Windpower II
Queue ID56359_PH2
Statusoperational
Source status(OP) Operating
MarketAVRN
TechnologyWind
Capacity75.0 MW
StateOregon
CountySherman
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2005-07-01
Withdrawn date
Developer
Utility / transmission ownerAvangrid Power LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata