Kokomo Webster St. to Walton 230 kV (J2919)

Kokomo Webster St. to Walton 230 kV is a 142.6 MW wind interconnection project in Montgomery, Indiana with a current status of withdrawn. It is proposed to connect at Kokomo Webster St. to Walton 230 kV.

142.6 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameKokomo Webster St. to Walton 230 kV
Queue IDJ2919
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity142.6 MW
StateIndiana
CountyMontgomery
Point of interconnectionKokomo Webster St. to Walton 230 kV
Requested (queue) date2022-09-14
Proposed in-service date2027-06-01
Operational date2027-06-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata