Kokomo Webster St. - Walton 230.0kV (J2038)

Kokomo Webster St. - Walton 230.0kV is a 300.0 MW wind interconnection project in Montgomery, Indiana with a current status of withdrawn. It is proposed to connect at Kokomo Webster St. - Walton 230.0kV.

300.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameKokomo Webster St. - Walton 230.0kV
Queue IDJ2038
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity300.0 MW
StateIndiana
CountyMontgomery
Point of interconnectionKokomo Webster St. - Walton 230.0kV
Requested (queue) date2021-08-26
Proposed in-service date2024-04-15
Operational date2024-04-15
Withdrawn date2025-12-18
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata