KSU Solar Array (70214_KSUSA)

KSU Solar Array is a 5.5 MW solar interconnection project in Portage, Ohio with a current status of operational.

5.5 MWCapacity
OperationalStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameKSU Solar Array
Queue ID70214_KSUSA
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologySolar
Capacity5.5 MW
StateOhio
CountyPortage
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-06-01
Withdrawn date
Developer
Utility / transmission ownerOnsite Partners, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata