KUMEYAAY/CAMPO WIND FARM (19)

KUMEYAAY/CAMPO WIND FARM is a 46.0 MW wind interconnection project in San Diego, California with a current status of operational. It is proposed to connect at Crestwood Substation 69 kV.

46.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameKUMEYAAY/CAMPO WIND FARM
Queue ID19
Statusoperational
Source statusCOMPLETED
Market
TechnologyWind
Capacity46.0 MW
StateCalifornia
CountySan Diego
Point of interconnectionCrestwood Substation 69 kV
Requested (queue) date2003-06-18
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata